Casing head Housing
Jump to navigation
Jump to search
Casing head Housing is installed on top of the surface casing string. It has an upper flanged connection. Once it is installed ot provides: a landing shoulder for the next casing string and s flanged connection for the BOP stack to be connected to the well.