Blog | Tools | Glossary | Search

Share:   |  feedback   |  Join us  

Drilling out

From petrofaq
Jump to navigation Jump to search

Drilling out: When a well must be deviated or side-tracked, either as planned or to avoid a fish, it is normally necessary to cut a hole in the casing wall and drill out on the new path. Also when drilling out of casing after cementing.