Gas lift
Jump to navigation
Jump to search
Gas lift is the increasing of the oil production flow by injecting gas down a well to mingle with the oil, thus decreasing the average density of fluid and increasing flow rate. The gas can then be recovered and re-injected.
Gas lift advantages
- Operation of gas lift valves is unaffected by produced solids (sand etc.)
- Gas lift operation is unaffected by deviated or crooked holes.
- Use of side pocket mandrels allows easy wireline replacements of (inexpensive) gas lift valves when deviation <650.
- Provides full bore tubing access for coiled tubing or other well service work.
- High gas oil ratio improves lift performance rather than presenting problems as with other artificial lift methods.
- Low surface profile important for offshore & urban locations.
- Tubing & annular subsurface safety valves available when required by safety regulations.
- Gas lift tolerates "bad" design - though "good" design is more difficult.
- Gas lift has a low initial (downhole) equipment cost.
- Gas lift has a low operational and maintenance costs. Major workovers are infrequent when wireline servicing is possible.
- Well completions are relatively simple. This can be important in remote areas.
- Gas lift operation independent of bottom hole temperature.
- Flexible:
- can produce from a wide range depths & flow rates.
- uses the same well equipment from 100-10,000bpd production rates.
- copes with uncertainties and changes in reservoir performance,reservoir pressure, water cut & production index over the well life.
Gas lift limitations
- High tubing intake pressure due to fluid in the tubing restricts production e.g. Gas lifting a well with a Productivity Index of 1 bpd/psi from 10,000 ft with a static bottom hole pressure of 1000 psi is difficult.
- Flowing bottom hole pressure is greater than with e.g. Electric Submersible Pumps. This leads to a potential loss of reserves in depletion type reservoirs.
- Gas lift is inefficient in energy terms (typically 15-20%).
- Gas compressors have a high capital cost. They require expensive maintenance & require skilled operations staff. However, they may already be required for gas sales.
- Annulus full of high pressure gas represents a safety hazard.
- High installation cost can result from top sides modifications to existing platforms e.g. Compressor installation.
- Gas lifting of viscous crude (<150 API) is even less efficient.
- Wax precipitation problems may increase due to cooling from (cold) gas injection & subsequent expansion.
- Hydrate blocking of surface gas injection lines can occur during cold weather if gas is not adequately dried.
- Lifting of low fluid volumes is inefficient due to gas slippage.
- Good data management and complete production/gas lift network modelling is required for efficient/maximum profitability operation.
- Adequate gas supply required throughout project life:
- Decreasing BHP, increasing water cut etc.
- Sufficient gas to start up FIRST well.
- Slow start up after facility shut down.
- Increased gas handling requirements in facilities.